03 · Services
V-Cycle Development
From requirements to validation, with bidirectional traceability and ASPICE-ready work products.
- Architecture
- Development
- Validation
We run development along the V-cycle: requirements and design on the left, integration, verification and validation on the right, traceability across both. Each step produces the work products that ASPICE and ISO 26262 expect, reviewed and baselined. We can own a full work package or reinforce your team on requirements, design or integration.
What we do
- Cascade requirements from customer to system, then to software and hardware.
- Keep bidirectional traceability between requirements, design and tests.
- Design systems and software, then integrate, verify and validate them.
- Run ASPICE-aligned processes, with delivery experience at capability level 2 (CL2).
- Produce and review work products: specifications, designs, test reports.
- Manage requirements in DOORS, in ALM tools or in PLM such as Teamcenter.
- Lead technical delivery: customer ownership, budget, schedule.
- Coordinate multi-site engineering teams.